Safety & Emergency Preparedness
Safety & Emergency Preparedness
MANDATORY
6 criteria
| Standard 5.1 NON-NEGOTIABLE · Standard 5: Safety & Emergency Preparedness Triage Actually Sorts Patients by Urgency |
ASSESSMENT ASF-STD5-v3.0 |
| CR FULL | TR FULL | SM FULL | ST FULL |
| 5.1 NON-NEGOTIABLE L1 |
THE STANDARD Triage Actually Sorts Patients by Urgency A structured triage system using a validated, internationally recognised urgency scale — such as the Manchester Triage System, the Canadian Triage and Acuity Scale, or an equivalent validated tool — prioritises patients by clinical urgency, used consistently for every arriving patient, not applied selectively based on how busy the department is. |
| HOSPITAL SELF-ASSESSMENT Tick YES, PARTIAL, or NO for each question. |
| 1 | Is a validated, internationally recognised triage scale used, not an informal or home-grown urgency judgement? A named, validated tool — Manchester Triage System or equivalent — not individual staff discretion alone. Doc: Triage scale documentation and completed sample |
YES | PARTIAL | NO |
| 2 | Does every triage nurse or staff member use the same scale consistently, not a personal variation of it? Consistency across staff is what makes the scale meaningful as a system, not just a suggestion. Doc: Staff training record on the specific scale used |
YES | PARTIAL | NO |
| 3 | Is the assigned urgency category documented for every patient, with the maximum wait time it implies? A category without a documented, implied wait time doesn't translate into an actual commitment to the patient. Doc: Documented urgency category and wait time sample |
YES | PARTIAL | NO |
ALL YES Standard likely met. ANY PARTIAL Improvement plan required. ANY NO Blocks accreditation until resolved.
| WHAT THE ASSESSOR DOES ON SITE no surprises, no hidden checks |
| DOCUMENT Scale validation review |
Reviews which triage scale is in use and confirms it is a validated, named system, not an informal internal variation. |
| OBSERVE Live triage consistency check |
Observes triage being performed by different staff members, checking for consistent application of the same scale. |
| ASK Staff scale familiarity interview |
Asks triage staff to name the scale in use and describe how a specific recent case was categorised. |
REFERENCES
| Standard 5.1 · Standard 5: Safety & Emergency Preparedness Guidance & Learning |
GUIDANCE ASF-STD5-v3.0 |
| WHY THIS STANDARD EXISTS |
Triage exists specifically for the moments it's hardest to do properly — when the department is overwhelmed. A system only used consistently when things are quiet provides no protection during the exact conditions it was built for. A validated scale matters because an informal, home-grown urgency judgement varies significantly between staff members, while a validated tool has been tested for consistency and predictive accuracy.
| WHAT GOOD LOOKS LIKE ✓ A validated, named triage scale is used consistently by every staff member performing triage. ✓ Urgency categories are documented for every patient with their implied maximum wait time. ✓ Staff can name the scale and describe their reasoning for a real recent categorisation confidently. |
WHAT FAILURE LOOKS LIKE ✗ Triage relies on individual clinical judgement without reference to any named, validated scale. ✗ Different staff members apply visibly different standards for the same presenting complaint. ✗ Urgency categories, if assigned, aren't documented or linked to any specific wait time commitment. |
| MOST COMMON REASONS HOSPITALS SCORE PARTIAL |
1 A validated scale is used by senior triage nurses but newer or covering staff sometimes default to informal judgement.
Formal training on a specific scale needs to reach everyone who performs triage, not just the most experienced staff.
2 The scale is used correctly for common presentations but less reliably for less familiar or atypical ones.
Validated scales are designed for exactly this consistency, but familiarity with common cases can make staff over-confident with unusual ones.
3 Categorisation happens but isn't consistently re-checked if a patient's condition changes while waiting.
Triage is a snapshot at arrival; a patient can deteriorate while waiting, and only reassessment catches that.
| HOW TO IMPLEMENT IF YOU ARE STARTING FROM ZERO |
Week 1 Confirm which triage approach is currently used and whether it is a validated, named scale.
Week 2 Adopt a validated scale if none is currently in use, and train all staff who perform triage.
Week 3 Establish consistent documentation of assigned urgency category and implied wait time for every patient.
Ongoing Periodically observe triage practice across different staff members to confirm consistent application.
| FOR SURVEYORS — WHAT IS NOT OBVIOUS |
Ask staff to name the specific scale, not just describe general urgency sorting.
A facility genuinely using a validated scale can name it immediately; one relying on informal judgement usually cannot.
Observe triage by more than one staff member if possible.
Consistency across individuals is the real test of whether a scale is genuinely standardising practice.
| E-LEARNING academy.gmj.ge/std5-1-triage — 30 min · complete before self-assessment |
| Standard 5.2 NON-NEGOTIABLE · Standard 5: Safety & Emergency Preparedness Resuscitation Equipment Is Ready Right Now |
ASSESSMENT ASF-STD5-v3.0 |
| CR FULL | TR FULL | SM FULL | ST FULL |
| 5.2 NON-NEGOTIABLE L1 |
THE STANDARD Resuscitation Equipment Is Ready Right Now Resuscitation equipment is checked every shift, fully stocked and functional, and staff maintaining life support competency are genuinely current, not overdue for recertification. |
| HOSPITAL SELF-ASSESSMENT Tick YES, PARTIAL, or NO for each question. |
| 1 | Is resuscitation equipment checked every shift, with a documented record? Not checked "regularly" — checked every single shift, verifiably. Doc: Shift check log |
YES | PARTIAL | NO |
| 2 | Is all equipment found fully stocked and functional at each check, with gaps immediately addressed? A check that finds gaps but doesn't trigger immediate resupply provides only partial protection. Doc: Gap resolution record |
YES | PARTIAL | NO |
| 3 | Are all relevant staff current on life support certification, not overdue? A lapsed certification discovered only during an emergency is a preventable failure. Doc: Certification tracking record |
YES | PARTIAL | NO |
ALL YES Standard likely met. ANY PARTIAL Improvement plan required. ANY NO Blocks accreditation until resolved.
| WHAT THE ASSESSOR DOES ON SITE no surprises, no hidden checks |
| DOCUMENT Shift check log review |
Reviews shift check logs for consistency and completeness across a representative time period. |
| OBSERVE Live equipment check |
Directly inspects resuscitation equipment for stock completeness and functionality at the time of assessment. |
| DOCUMENT Certification currency check |
Reviews staff certification records for any lapsed or soon-to-lapse life support credentials. |
REFERENCES
Resuscitation readiness protocols, including scheduled equipment checks and current life-support certification, are foundational elements of resuscitation system quality frameworks across international emergency care guidance.
| Standard 5.2 · Standard 5: Safety & Emergency Preparedness Guidance & Learning |
GUIDANCE ASF-STD5-v3.0 |
| WHY THIS STANDARD EXISTS |
Resuscitation equipment has exactly one moment where its readiness matters, and there's no opportunity to discover a gap and fix it in the moment. A shift-check routine that's actually followed is the only mechanism that catches a problem before it costs a life.
| WHAT GOOD LOOKS LIKE ✓ Shift checks are documented consistently, every shift, with no gaps. ✓ Equipment is fully stocked and functional at the point of assessment. ✓ All relevant staff hold current, unexpired life support certification. |
WHAT FAILURE LOOKS LIKE ✗ Shift check logs show gaps or inconsistent completion. ✗ Equipment found during assessment has missing or expired components. ✗ One or more staff members have lapsed certification without a tracked renewal plan. |
| MOST COMMON REASONS HOSPITALS SCORE PARTIAL |
1 Checks happen consistently during day shifts but less reliably overnight.
Staffing levels and supervision often differ by shift, and routine tasks can erode accordingly.
2 Equipment is checked but gaps found aren't always resolved before the next shift.
Detection without immediate resolution leaves a real gap in coverage.
3 Certification tracking exists but renewal reminders aren't proactive.
A system that only notices a lapse after it happens provides no advance protection.
| HOW TO IMPLEMENT IF YOU ARE STARTING FROM ZERO |
Week 1 Audit shift check log completeness across all shifts, including overnight.
Week 2 Establish an immediate resolution process for any gap found during a check.
Week 3 Build a proactive certification renewal tracking and reminder system.
Ongoing Spot-check equipment readiness and certification currency periodically, unannounced.
| FOR SURVEYORS — WHAT IS NOT OBVIOUS |
Check overnight and weekend logs specifically, not just weekday daytime records.
Coverage gaps concentrate in less-supervised shifts.
Physically inspect equipment yourself rather than relying on the log alone.
A completed log entry and genuinely current equipment aren't always the same thing.
| E-LEARNING academy.gmj.ge/std5-2-resuscitation-readiness — 30 min · complete before self-assessment |
| Standard 5.3 NON-NEGOTIABLE · Standard 5: Safety & Emergency Preparedness There's a Real Disaster Response Plan |
ASSESSMENT ASF-STD5-v3.0 |
| CR ADAPTED | TR FULL | SM FULL | ST FULL |
| 5.3 NON-NEGOTIABLE L1 |
THE STANDARD There's a Real Disaster Response Plan A mass casualty and disaster response plan exists and has actually been practised through a drill, not written once and filed without ever being tested. |
| HOSPITAL SELF-ASSESSMENT Tick YES, PARTIAL, or NO for each question. |
| 1 | Does a documented mass casualty and disaster response plan exist? Specific to mass casualty and disaster scenarios, not a general emergency policy. Doc: Disaster response plan document |
YES | PARTIAL | NO |
| 2 | Has the plan actually been practised through a drill, not just written and filed? An unrehearsed plan's real-world gaps are unknown until an actual disaster reveals them. Doc: Drill record, including date and participants |
YES | PARTIAL | NO |
| 3 | Were lessons from the drill documented and used to update the plan? A drill that doesn't feed back into plan improvement misses much of its value. Doc: Post-drill review and plan revision record |
YES | PARTIAL | NO |
ALL YES Standard likely met. ANY PARTIAL Improvement plan required. ANY NO Blocks accreditation until resolved.
| WHAT THE ASSESSOR DOES ON SITE no surprises, no hidden checks |
| DOCUMENT Plan and drill record review |
Reviews the disaster response plan document and checks for evidence of an actual, dated drill. |
| ASK Staff role-awareness interview |
Asks a staff member their specific role in the disaster plan, testing genuine familiarity versus general awareness a plan exists. |
| DOCUMENT Post-drill improvement check |
Checks whether any post-drill review led to documented changes in the plan. |
REFERENCES
Disaster preparedness frameworks consistently identify drill practice, not plan documentation alone, as the determining factor in real-world response effectiveness during mass casualty events.
| Standard 5.3 · Standard 5: Safety & Emergency Preparedness Guidance & Learning |
GUIDANCE ASF-STD5-v3.0 |
| WHY THIS STANDARD EXISTS |
A disaster plan that has never been rehearsed reveals its gaps for the first time during an actual disaster, when there's no opportunity to learn from the failure safely. A practised plan surfaces its weaknesses in advance, when correcting them still costs nothing but time.
| WHAT GOOD LOOKS LIKE ✓ A specific, detailed disaster response plan exists and has been practised through a real drill. ✓ Staff can describe their specific role in the plan confidently. ✓ Drill outcomes are documented and have led to real plan improvements. |
WHAT FAILURE LOOKS LIKE ✗ A plan exists only as a document, never practised through any drill. ✗ Staff asked about their role in a disaster scenario have no clear answer. ✗ No evidence exists that drill lessons, if any drill occurred, changed the plan at all. |
| MOST COMMON REASONS HOSPITALS SCORE PARTIAL |
1 A drill was run once, years ago, with no repeat since.
Staff turnover and plan changes mean a single historical drill doesn't reflect current readiness.
2 The plan is detailed for the facility's own response but doesn't address coordination with external emergency services.
Real disasters typically require coordination this kind of plan sometimes overlooks.
3 A drill happened but was announced well in advance, testing preparation rather than genuine readiness.
An announced drill tests whether staff can execute a rehearsed response, not whether they're actually ready for the unexpected.
| HOW TO IMPLEMENT IF YOU ARE STARTING FROM ZERO |
Week 1 Review the current disaster plan for specificity and last drill date.
Week 2 Schedule and run a drill if none has occurred recently.
Week 3 Conduct a structured post-drill review and document specific plan improvements.
Ongoing Repeat drills on a fixed schedule, varying scenarios and announcement timing.
| FOR SURVEYORS — WHAT IS NOT OBVIOUS |
Ask for the drill date and participant list, not a general assurance drills happen.
Specific, dated evidence is the only real proof of practice.
Ask a random staff member their specific role, not a senior manager who wrote the plan.
Genuine, distributed familiarity is the real test, not authorship-level knowledge.
| E-LEARNING academy.gmj.ge/std5-3-disaster-plan — 30 min · complete before self-assessment |
| Standard 5.4 NON-NEGOTIABLE · Standard 5: Safety & Emergency Preparedness Fire Safety Is Real, Not Theoretical |
ASSESSMENT ASF-STD5-v3.0 |
| CR ADAPTED | TR FULL | SM FULL | ST FULL |
| 5.4 NON-NEGOTIABLE L1 |
THE STANDARD Fire Safety Is Real, Not Theoretical Fire safety equipment is tested on schedule and an evacuation drill has actually been run, with real participation, not merely documented as a policy requirement. |
| HOSPITAL SELF-ASSESSMENT Tick YES, PARTIAL, or NO for each question. |
| 1 | Is fire safety equipment tested on a defined schedule, with records kept? Extinguishers, alarms, and sprinkler systems specifically, not a general assumption of functionality. Doc: Fire equipment testing log |
YES | PARTIAL | NO |
| 2 | Has an evacuation drill actually been run, with real staff and patient-area participation? A tabletop discussion of the evacuation plan is not the same as a physical drill. Doc: Drill record, date and scope |
YES | PARTIAL | NO |
| 3 | Are evacuation routes kept genuinely clear, not obstructed in practice? A route that's clear on paper but blocked by stored equipment fails when it matters. Doc: Route clearance check |
YES | PARTIAL | NO |
ALL YES Standard likely met. ANY PARTIAL Improvement plan required. ANY NO Blocks accreditation until resolved.
| WHAT THE ASSESSOR DOES ON SITE no surprises, no hidden checks |
| DOCUMENT Equipment testing record review |
Reviews fire safety equipment testing records for schedule consistency. |
| DOCUMENT Drill record check |
Checks for a specific, dated evacuation drill record, including scope and participation. |
| OBSERVE Evacuation route check |
Physically checks that marked evacuation routes are genuinely clear and unobstructed. |
REFERENCES
Fire safety and evacuation drill practice are established requirements in healthcare facility safety frameworks precisely because untested procedures reliably fail to translate into effective real-world response.
| Standard 5.4 · Standard 5: Safety & Emergency Preparedness Guidance & Learning |
GUIDANCE ASF-STD5-v3.0 |
| WHY THIS STANDARD EXISTS |
Fire safety equipment that's present but untested, and evacuation procedures that exist only on paper, provide the appearance of safety without its substance. A real drill is what reveals whether people actually know what to do, not just whether a plan describes what they should do.
| WHAT GOOD LOOKS LIKE ✓ Fire safety equipment is tested on a consistent, documented schedule. ✓ A real evacuation drill has been run, with genuine staff and area participation. ✓ Evacuation routes are verified clear at the time of assessment. |
WHAT FAILURE LOOKS LIKE ✗ Equipment testing records show gaps or don't exist. ✗ No evidence of an actual physical evacuation drill, only a written plan. ✗ Evacuation routes are found obstructed by stored equipment or furniture. |
| MOST COMMON REASONS HOSPITALS SCORE PARTIAL |
1 Equipment testing happens for alarms but less consistently for extinguishers or sprinkler systems.
Different systems can develop different, uneven testing discipline over time.
2 A drill was run in one part of the facility but not extended to all areas.
Partial drilling tests partial readiness, leaving genuine gaps in areas never included.
3 Evacuation routes are clear during the day but accumulate obstruction over time between checks.
A route clear at drill time doesn't guarantee it stays clear as daily operations continue.
| HOW TO IMPLEMENT IF YOU ARE STARTING FROM ZERO |
Week 1 Audit fire safety equipment testing records for consistency across all system types.
Week 2 Schedule and run a genuine evacuation drill if none has occurred recently, covering all areas.
Week 3 Establish a routine evacuation route clearance check, not just a one-time verification.
Ongoing Repeat drills on a fixed schedule and monitor route clearance routinely.
| FOR SURVEYORS — WHAT IS NOT OBVIOUS |
Ask for the drill date and which areas were included, not a general statement drills occur.
Partial drilling is a common, specific gap worth checking directly.
Walk the evacuation routes yourself.
Obstruction accumulates gradually and may not be visible from records alone.
| E-LEARNING academy.gmj.ge/std5-4-fire-safety — 30 min · complete before self-assessment |
| Standard 5.5 NON-NEGOTIABLE · Standard 5: Safety & Emergency Preparedness Workplace Violence Is Prevented, Not Just Responded To |
ASSESSMENT ASF-STD5-v3.0 |
| CR FULL | TR FULL | SM FULL | ST FULL |
| 5.5 NON-NEGOTIABLE L1 |
THE STANDARD Workplace Violence Is Prevented, Not Just Responded To A specific workplace violence prevention policy covers violence from patients, visitors, and staff-on-staff, with real preventive measures in place — not a policy that only describes what happens after an incident occurs. |
| HOSPITAL SELF-ASSESSMENT Tick YES, PARTIAL, or NO for each question. |
| 1 | Is there a written workplace violence policy covering violence from patients and visitors, and separately, staff-on-staff violence? Both categories explicitly, not just one assumed to cover the other. Doc: Workplace violence policy document |
YES | PARTIAL | NO |
| 2 | Was the policy developed in consultation with staff, not written and issued without their input? Genuine consultation, since staff experience is what makes a prevention policy actually relevant. Doc: Consultation record |
YES | PARTIAL | NO |
| 3 | Are real preventive measures in place — not only a response plan for after an incident occurs? Prevention, not just reaction — physical measures, staffing considerations, early warning signs training. Doc: Preventive measures documentation |
YES | PARTIAL | NO |
ALL YES Standard likely met. ANY PARTIAL Improvement plan required. ANY NO Blocks accreditation until resolved.
| WHAT THE ASSESSOR DOES ON SITE no surprises, no hidden checks |
| DOCUMENT Policy scope review |
Reviews the workplace violence policy for coverage of both patient/visitor and staff-on-staff violence. |
| DOCUMENT Consultation record check |
Checks for evidence the policy was developed with genuine staff consultation. |
| OBSERVE Preventive measures check |
Checks for real, implemented preventive measures, not only a documented post-incident response plan. |
REFERENCES
| Standard 5.5 · Standard 5: Safety & Emergency Preparedness Guidance & Learning |
GUIDANCE ASF-STD5-v3.0 |
| WHY THIS STANDARD EXISTS |
Healthcare settings carry a disproportionately high risk of workplace violence, and a facility that only has a response plan for after an incident has already failed the more important task: reducing the likelihood of the incident happening at all through genuine prevention.
| WHAT GOOD LOOKS LIKE ✓ A written policy explicitly covers both patient/visitor violence and staff-on-staff violence. ✓ The policy was developed with genuine staff consultation. ✓ Real preventive measures are visibly in place, not only a response plan. |
WHAT FAILURE LOOKS LIKE ✗ The policy addresses only patient/visitor violence, silent on staff-on-staff incidents, or vice versa. ✗ The policy was issued without any staff consultation. ✗ Only a post-incident response plan exists, with no genuine preventive measures. |
| MOST COMMON REASONS HOSPITALS SCORE PARTIAL |
1 The policy covers patient and visitor violence well but staff-on-staff violence is addressed only vaguely.
Workplace violence prevention often develops with more attention to external threats than internal ones.
2 Consultation happened once at the policy's creation but hasn't been revisited as conditions changed.
A policy set once without periodic review may not reflect current real risks or staff experience.
3 Preventive measures exist for physical security but not for early recognition and de-escalation training.
Physical measures alone don't address the interpersonal skills that often prevent escalation in the first place.
| HOW TO IMPLEMENT IF YOU ARE STARTING FROM ZERO |
Week 1 Review the current policy for coverage of both violence categories and evidence of staff consultation.
Week 2 Consult staff directly if the policy was not originally developed with their input.
Week 3 Establish specific preventive measures, including de-escalation training, not only physical security or response planning.
Ongoing Revisit the policy and preventive measures periodically as conditions and staff feedback evolve.
| FOR SURVEYORS — WHAT IS NOT OBVIOUS |
Ask staff directly whether they were consulted on the policy.
Staff-reported consultation experience is more reliable than a policy document's stated process.
Ask about staff-on-staff violence specifically, not just patient and visitor incidents.
This category is more commonly under-addressed in practice.
| E-LEARNING academy.gmj.ge/std5-5-workplace-violence — 30 min · complete before self-assessment |
| Standard 5.6 NON-NEGOTIABLE · Standard 5: Safety & Emergency Preparedness Internal Emergency Alerts Are Clear, Consistent, and Trained |
ASSESSMENT ASF-STD5-v3.0 |
| CR FULL | TR FULL | SM FULL | ST FULL |
| 5.6 NON-NEGOTIABLE L1 |
THE STANDARD Internal Emergency Alerts Are Clear, Consistent, and Trained The facility has a clearly defined, documented internal emergency alert system — whether colour-coded or plain-language — covering the significant emergency types relevant to this facility, with every staff member trained and able to respond correctly, not assuming staff will infer meaning from context. |
| HOSPITAL SELF-ASSESSMENT Tick YES, PARTIAL, or NO for each question. |
| 1 | Does the facility have a clearly documented internal emergency alert system, whether colour-coded or plain-language? A specific, written system — not an assumption that staff will understand codes from general experience elsewhere. Doc: Internal emergency alert system document |
YES | PARTIAL | NO |
| 2 | Are all staff, including new hires and temporary or agency staff, trained on this specific facility's system? Facility-specific training, not reliance on what a code meant at a previous workplace. Doc: Training record covering all staff categories |
YES | PARTIAL | NO |
| 3 | Can staff correctly state what happens for each alert type used at this facility, not just recognise that an alert occurred? Understanding the required response, not just recognising that something is happening. Doc: N/A — tested directly |
YES | PARTIAL | NO |
ALL YES Standard likely met. ANY PARTIAL Improvement plan required. ANY NO Blocks accreditation until resolved.
| WHAT THE ASSESSOR DOES ON SITE no surprises, no hidden checks |
| DOCUMENT Alert system documentation review |
Reviews the facility's documented internal emergency alert system for clarity and completeness across relevant emergency types. |
| ASK Staff response interview |
Asks staff, including newer or temporary staff, what a specific alert means and what their required response is. |
| DOCUMENT Training coverage check |
Reviews training records to confirm coverage extends to temporary, agency, and newly hired staff, not only long-term permanent staff. |
REFERENCES
| Standard 5.6 · Standard 5: Safety & Emergency Preparedness Guidance & Learning |
GUIDANCE ASF-STD5-v3.0 |
| WHY THIS STANDARD EXISTS |
Hospital emergency codes are not internationally standardised — the same colour can mean entirely different things at different facilities, and this inconsistency has caused real, documented confusion, particularly for staff who move between institutions. What matters is not which specific system a facility chooses, but that its own system is clearly defined, consistently used, and genuinely understood by every relevant staff member.
| WHAT GOOD LOOKS LIKE ✓ A clear, documented internal alert system exists, whether colour-coded or plain-language. ✓ All staff categories, including temporary and agency staff, are trained on this specific system. ✓ Staff can correctly state the required response for each alert type used. |
WHAT FAILURE LOOKS LIKE ✗ No documented system exists; staff are expected to infer meaning from context or prior experience elsewhere. ✗ Training reaches long-term staff but not temporary, agency, or newly hired staff. ✗ Staff recognise that an alert occurred but cannot state the correct required response. |
| MOST COMMON REASONS HOSPITALS SCORE PARTIAL |
1 The system is well understood by clinical staff but not by support, administrative, or facilities staff who may also need to respond.
Emergency response often depends on more than just clinical staff, and gaps in non-clinical understanding create real coordination risk.
2 Training happens at induction but is never refreshed, and understanding fades over time.
A one-time training without periodic reinforcement doesn't guarantee lasting recall under real pressure.
3 The system is clear for common alerts like cardiac arrest but less clear for less frequent ones like an infant abduction or bomb threat.
Rarely used alerts are exactly the ones most likely to be forgotten without periodic reinforcement.
| HOW TO IMPLEMENT IF YOU ARE STARTING FROM ZERO |
Week 1 Document the facility's current internal emergency alert system clearly, whether colour-coded or plain-language.
Week 2 Extend training to cover all staff categories, including temporary and agency staff specifically.
Week 3 Consider whether a plain-language approach would reduce confusion, particularly for facilities with high staff turnover or many temporary staff.
Ongoing Refresh training periodically, with particular attention to less frequently used alert types.
| FOR SURVEYORS — WHAT IS NOT OBVIOUS |
Ask a temporary or newer staff member specifically, not a long-term employee.
This is where genuine gaps in facility-specific understanding are most likely to surface.
Ask about a less common alert type, not just the most familiar one.
Understanding of rare but critical alerts often lags behind common ones like a cardiac arrest code.
| E-LEARNING academy.gmj.ge/std5-6-internal-emergency-alerts — 30 min · complete before self-assessment |

Hospital Standards — overviewFacility Classification — Which Type of Hospital Are You?Standard 1 — Access & ArrivalStandard 2 — Reception & InformationStandard 3 — Environment & Shared SpacesStandard 4 — Care & TreatmentStandard 5 — Safety & Emergency PreparednessStandard 6 — Aftercare & Follow-upStandard 7 — Governance & ManagementStandard 8 — Medical TourismStandard 9 — Refugee & Migrant HealthReferences & Index
STANDARD 5Safety & Emergency Preparedness5.1 Triage Actually Sorts Patients by Urgency5.2 Resuscitation Equipment Is Ready Right Now5.3 There's a Real Disaster Response Plan5.4 Fire Safety Is Real, Not Theoretical5.5 Workplace Violence Is Prevented, Not Just Responded To5.6 Internal Emergency Alerts Are Clear, Consistent, and Trained
Test your facility against this standard
Open self-assessment — no login, no fee.