Policy · FLD-POL-001 · Version 1.0 · Approved by the ASF Expert Committee

Supports: 9.1

At a glance

  • No patient is admitted until the minimum set-up checklist (FLD-FRM-001) is signed.
  • The unit has separate areas for triage, treatment and isolation.
  • Water, sanitation and waste disposal meet the minimum before admission.
  • Any item that fails is recorded and fixed before admission, or admission is limited.
  • Stop and get help straight away if: a patient is admitted before the set-up checklist is signed, or with no isolation area.

1. Purpose

To make sure a field unit is safe before the first patient arrives (9.1).

2. Scope

Applies to Clinical and support staff in the hospital
Locations All wards, clinics and departments of the facility
When Whenever the activity described is carried out
Does not apply to Activities covered by another document listed in section 15

3. Definitions

Term Meaning
Clinical lead The doctor or nurse in charge of the area at the time

4. Background

A field hospital opened in a hurry can be unsafe before the first patient arrives. A defined minimum set-up, checked before admission, means the basics are in place from the start.

5. Responsibilities

Role Responsibility Competence
Field unit lead Owns the set-up and signs the checklist Clinician
Water and sanitation lead Confirms water, sanitation and waste Engineer

6. Materials and equipment

Item Requirement Condition
Records and forms named in this document Current version Checked before use

7. Safety

8. Before you start

9. Procedure

Step 1. Check the set-up.

  • Complete FLD-FRM-001 before admission, covering structure, areas, water, sanitation, waste and power.

Key point: Checked before the first patient.

Step 2. Separate the areas.

  • Keep triage, treatment and isolation areas separate, with a floor plan on file.

Key point: Three areas, kept apart.

Step 3. Test the water and waste.

  • Test water (WAT-FRM-001) and record waste disposal (WST-FRM-001) before admission.

Key point: Tested, not assumed.

10. Decision points

11. Special situations

Situation Action
Out of hours Follow the same steps. Use the on-call contact on the wall of the area.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Units admitted with a signed set-up checklist 100% Each opening Field unit lead Escalate to the coordinating authority

14. Records

Record Kept in Retention
Record named in this document Patient record or the area file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
FLD-FRM-001 Minimum set-up checklist Checklist
WAT-PLN-001 Water interruption contingency plan (existing, reused) Plan

17. Evidence

Reference Note
E-009 Based on the Sphere Handbook, Humanitarian Charter and Minimum Standards in Humanitarian Response (2018).
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version set Expert Committee approval