EDITIONEN·FR·ქართ

Accréditation Sans Frontières

International Accreditation of Healthcare Facilities

Standards › Standard S6 › Standard operating procedures (SOPs)

Standard operating procedure (SOP) · PTR-SOP-001 · Version 1.0 · Approved by the ASF Expert Committee

Supports: System S6 (Patient transfers and referrals), criterion S6.1, S6.2, S6.4, S6.24, S6.29

At a glance

  • Write a plan for every transfer, naming the party responsible at each segment.
  • State the handover point where our responsibility ends.
  • Cover route or flight, timings, crew, escort, equipment and what happens if the transfer fails midway.
  • Plan the ground journey to and from the airport as part of the transfer.
  • Stop and get help straight away if: a transfer departs with no plan, or with a segment whose responsible party is not named.

1. Purpose

To make responsibility, timing and contingency clear for every segment of a transfer before it starts (S6.1, S6.2, S6.4, S6.24, S6.29).

2. Scope

Applies to Clinical and support staff in the hospital
Locations All wards, clinics and departments of the facility
When Whenever the activity described is carried out
Does not apply to Activities covered by another document listed in section 15

3. Definitions

Term Meaning
Clinical lead The doctor or nurse in charge of the area at the time

4. Background

A vehicle that breaks down or is in an accident leaves the patient exposed. A written contingency plan with a backup vehicle or service keeps care going.

5. Responsibilities

Role Responsibility Competence
Dispatch lead Writes and holds the plan Trained dispatcher
Clinical lead Approves the clinical parts Clinician

6. Materials and equipment

Item Requirement Condition
Records and forms named in this document Current version Checked before use

7. Safety

8. Before you start

9. Procedure

Step 1. Write the plan.

  • Complete PTR-FRM-002 for the whole journey.
  • Name the responsible party for each segment: pickup, ground to airport, air, destination airport, ground to the receiving facility.

Key point: Responsibility is named, not implied.

Step 2. Set the handover points.

  • Write the handover point where our responsibility ends, for each change of segment.

Key point: One handover point per change.

Step 3. Plan the failure.

  • Write what happens if the transfer fails midway or the escort cannot continue.
  • Name the alternative escort or the diversion point.

Key point: The plan must cover failure.

10. Decision points

11. Special situations

Situation Action
Out of hours Follow the same steps. Use the on-call contact on the wall of the area.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Transfers with a complete plan 100% Monthly Dispatch lead Escalate to clinical lead
Segments with a named responsible party 100% Monthly Dispatch lead Escalate to clinical lead

14. Records

Record Kept in Retention
Record named in this document Patient record or the area file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
PTR-FRM-002 Transfer plan Plan form
PTR-SOP-004 Air transport planning and authorisation Air

17. Evidence

Reference Note
E-009 ASF Expert Committee consensus.
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version set Expert Committee approval

E-learning for this document

No e-learning course is linked to this document yet.

References

Download this document as PDF
© 2026 Accréditation Sans Frontières · PHIG · Sheni Network