EDITIONEN·FR·ქართ

Accréditation Sans Frontières

International Accreditation of Healthcare Facilities

Standards › Standard 1 › Standard operating procedures (SOPs)

Standard operating procedure (SOP) · CLN-SOP-004 · Version 1.0 · Approved by the ASF Expert Committee

Supports: 1.6

At a glance

  • Every patient is assessed for pressure injury risk on admission.
  • The assessment is repeated at the set interval and after any change.
  • Each at-risk patient has a written prevention plan.
  • Prevention is started before any injury develops.
  • Stop and get help straight away if: an at-risk patient has no prevention plan, or a pressure injury develops with no plan in place.

1. Purpose

To prevent pressure injuries, which develop in hours in a patient who cannot move (1.6).

2. Scope

Applies to Clinical and support staff in the hospital
Locations All wards, clinics and departments of the facility
When Whenever the activity described is carried out
Does not apply to Activities covered by another document listed in section 15

3. Definitions

Term Meaning
Clinical lead The doctor or nurse in charge of the area at the time

4. Background

Pressure injuries develop in hours on a patient who cannot move, and they are among the most preventable harms in hospital. Assessing risk on admission and repeating it, with a plan, prevents them.

5. Responsibilities

Role Responsibility Competence
Ward nurse Assesses and sets the plan Nurse
Tissue viability lead Advises on surfaces and wounds Nurse specialist

6. Materials and equipment

Item Requirement Condition
Records and forms named in this document Current version Checked before use

7. Safety

8. Before you start

9. Procedure

Step 1. Assess.

  • Assess each patient on admission and at the set interval (CLN-FRM-006).

Key point: Risk is re-checked.

Step 2. Plan.

  • For each at-risk patient, set the repositioning schedule and the surface.
  • Record the plan.

Key point: A written plan.

Step 3. Check the skin.

  • Check the skin at each repositioning and report any change the same shift.

Key point: Early change, early action.

10. Decision points

11. Special situations

Situation Action
Out of hours Follow the same steps. Use the on-call contact on the wall of the area.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Patients assessed on admission 100% Monthly Ward manager Escalate to clinical director
At-risk patients with a written plan 100% Monthly Tissue viability lead Escalate to clinical director

14. Records

Record Kept in Retention
Record named in this document Patient record or the area file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
CLN-FRM-006 Pressure injury risk and prevention record Record

17. Evidence

Reference Note
E-009 Based on the international pressure injury prevention guideline (EPUAP, NPIAP and PPPIA, 2019).
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version set Expert Committee approval

E-learning for this document

References

Download this document as PDF
© 2026 Accréditation Sans Frontières · PHIG · Sheni Network