Standards › Standard 2B › Forms
Form · ENV-FRM-001 · Version 1.1 · Approved by the ASF Expert Committee
Supports: 2B.1
Purpose
Records the height and approach checks for the accessible reception point, with date and person.
How to complete
- Measure the working surface height and knee space.
- Walk the approach route with a wheelchair if possible.
- Record each measurement and the result (pass or action).
- Sign and date the record.
Checks
| Check | Entry |
|---|---|
| Working surface height within the range set (EC) | Measurement recorded [EC] |
| Knee space at least the set minimum (EC) | Measurement recorded [EC] |
| Approach route clear and wide enough (EC) | Yes [EC] |
| Point open and staffed in opening hours (spot check) | Yes [EC] |
| Photograph taken and filed | Yes [EC] |
Evidence
| Reference | Note |
|---|---|
| E-009 | ASF Expert Committee consensus. |
Change history
| Version | Date | What changed | Approval |
|---|---|---|---|
| 1.0 | the date of approval | First version | Approved by the ASF Expert Committee |
| 1.1 | the date of approval | Internal quality review: corrected cross-references, status wording and document control | Approved by the ASF Expert Committee |
E-learning for this document
- Access & Arrival: Getting Patients Through the Door (H-01)
- Reception & Information: The First Ten Minutes (H-02)
References
- Accréditation Sans Frontières (2026). ASF Expert Committee consensus on Standard 1. (E-009)