Standards › Standard 2B › Plans and templates

Plan / template · FAC-PLN-001 · Version 1.1 · Approved by the ASF Expert Committee

Supports: 2B.9

At a glance

  • List the critical services: power, water, medical gases, ventilation and clinical information systems.
  • For each, set the test schedule and the back-up arrangement.
  • Test each service on schedule and record the result.
  • Start a failure log for every fault, with its cause and the change made.
  • Review the log every quarter.
  • Stop and get help straight away if: a critical service has no back-up arrangement, or a failure is not logged.

1. Purpose

To prevent failures of critical services through planned testing and back-up, and to learn from each failure so it is not repeated [EC].

2. Scope

Applies to Facilities, engineering, IT, and clinical leads who depend on these services
Locations The whole facility
When Continuously; testing on schedule; review quarterly
Does not apply to Routine maintenance of individual devices, covered by EQP-SOP-001

3. Definitions

Term Meaning
Critical service A service whose failure would put patients at immediate risk
Back-up An alternative supply or system that keeps the service running until restored
Failure log The record of every failure, its cause and the change made

4. Background

Most failures in hospital services are predictable from testing and avoidable by back-up. Criterion 2B.9 requires planned prevention and analysis, not only repair after the event.

5. Responsibilities

Role Responsibility Competence
Facilities manager Owns the plan; runs testing; keeps the failure log Facilities engineering
IT lead Owns the information system back-up and downtime plan (SOP-074) IT competence
Clinical leads Know the back-up for their area; report failures at once Clinical management

6. Materials and equipment

Item Requirement Condition
Testing schedule Current; test dates per service Visible to facilities
Back-up equipment (generator, UPS, gas cylinders, stored water) Tested at the set interval Working and in date
Failure log (FAC-REG-002) Current Updated at each failure

7. Safety

8. Before you start

9. Procedure

Step 1. List the critical services.

  • List power, water, medical gases, ventilation and clinical information systems.
  • For each, record the areas it supports and the risk if it fails.

Key point: A service left off the list is never tested.

Step 2. Set the testing and back-up.

  • Set a test schedule for each service at the interval the manufacturer and the committee set (EC).
  • Set the back-up arrangement, its capacity, and its test interval.

Key point: Back-up that has never been tested may not work when needed.

Step 3. Test on schedule.

  • Carry out the tests and record the date, result and the tester.
  • Test back-up systems under load where the plan allows.

Key point: A test is the only evidence the back-up works.

Step 4. Log every failure.

  • Record each failure on FAC-REG-002: date, service, cause, duration, impact, and how it was restored.
  • Find the cause, not only the symptom.
  • Record the change that prevents recurrence.

Key point: A failure without a cause and a change will return.

Step 5. Review quarterly.

  • Review the log and the test results each quarter.
  • Look for repeated failures and ageing equipment.
  • Report to the governing body.

Key point: Patterns in the log show where to invest.

10. Decision points

11. Special situations

Situation Action
Planned shutdown Inform clinical leads in advance, use the back-up plan, and record the shutdown.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Critical services tested on schedule 100% Monthly Facilities manager Escalate to chief executive
Failures logged with cause and change 100% Each event Facilities manager Review of the event
Back-up tested on schedule 100% Monthly Facilities manager Escalate

14. Records

Record Kept in Retention
Testing schedule and results Facilities file the period set by the facility’s records policy years
FAC-REG-002 Failure Log Facilities file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
FAC-REG-002 Failure Log Used in step 4
FAC-SOP-002 Failure Logging and Analysis Procedure for the log
SOP-074 System Downtime Procedure (generic) IT downtime
EQP-SOP-001 Medical Equipment Maintenance Device maintenance

17. Evidence

Reference Note
E-009 ASF Expert Committee consensus. Test intervals and back-up capacity to be set against manufacturer instructions and national rules.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version Approved by the ASF Expert Committee
1.1 the date of approval Internal quality review: corrected cross-references, status wording and document control Approved by the ASF Expert Committee

E-learning for this document

Planned course: Planned fault prevention and maintenance. New course planned.