EDITIONEN·FR·ქართ

Accréditation Sans Frontières

International Accreditation of Healthcare Facilities

Standards › Standard S5 › Standard operating procedures (SOPs)

Standard operating procedure (SOP) · AMT-POL-001 · Version 1.0 · Approved by the ASF Expert Committee

Supports: System S5 (Ambulance and patient transport), criterion S5.2

At a glance

  • Use a partner operator only under a written agreement.
  • Check the partner’s certificates before the first use and at each renewal.
  • Set the standard each party must meet.
  • Record the handover responsibilities for each transfer.
  • Stop and get help straight away if: a partner aircraft, ambulance or escort is used with no signed agreement or with an expired certificate.

1. Purpose

To keep the standard of partner-provided transport the same as our own, and to keep the patient safe across the handover (S5.2).

2. Scope

Applies to Clinical and support staff in the hospital
Locations All wards, clinics and departments of the facility
When Whenever the activity described is carried out
Does not apply to Activities covered by another document listed in section 15

3. Definitions

Term Meaning
Clinical lead The doctor or nurse in charge of the area at the time

4. Background

When another company provides the aircraft, ambulance or escort, the patient is still in your care. A written agreement and checked certificates make sure each partner meets the same standard.

5. Responsibilities

Role Responsibility Competence
Accountable manager Signs the agreement and approves each partner Management
Dispatch lead Checks certificates before use and keeps the register Trained dispatcher

6. Materials and equipment

Item Requirement Condition
Partner agreement (signed) Current On file
Partner certificate Valid Copy on file

7. Safety

8. Before you start

9. Procedure

Step 1. Agree.

  • Sign a written agreement that sets the standards, the evidence of certification and the responsibility at each handover.

Key point: The agreement is the standard.

Step 2. Check evidence.

  • Check the certificates for the aircraft, the vehicle, the crew and the escort before first use.
  • Record the check on AMT-FRM-002.

Key point: The provider checks before use, not after.

Step 3. Use and renew.

  • Check the certificates again at each renewal date.
  • Stop using a partner whose certificate has expired.

Key point: Expired means not used.

10. Decision points

11. Special situations

Situation Action
Out of hours Follow the same steps. Use the on-call contact on the wall of the area.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Partners with signed agreement before use 100% Quarterly Accountable manager Escalate to chief executive
Partner certificates valid at use 100% Monthly Dispatch lead Escalate to accountable manager

14. Records

Record Kept in Retention
Record named in this document Patient record or the area file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
AMT-FRM-002 Partner certificate check Check form
AMT-REG-002 Receiving service agreements register Register

17. Evidence

Reference Note
E-009 ASF Expert Committee consensus.
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version set Expert Committee approval

E-learning for this document

No e-learning course is linked to this document yet.

References

Download this document as PDF

Related standard

Download this document as an editable Word file
© 2026 Accréditation Sans Frontières · PHIG · Sheni Network