Programme Risk Register

ASF Surveyor Training Programme — Operational Risk Management Framework
Aligned with ISQua EEA STP 4th Edition (2021) Standard 1, Criterion 1.3

Criterion 1.3
Version 2.1 — November 2026
Review: Annual
Owner: Programme Director

ISQua EEA STP Criterion Reference

1.3 Exact criterion text (ISQua EEA STP 4th Ed., 2021): “The organisation has a risk management process that identifies, assesses and manages risks associated with the surveyor training programme.”

MET ASF maintains a formal, documented Risk Register reviewed at least annually and after any significant programme change. The Register follows a standard risk matrix methodology (likelihood × impact) consistent with ISO 31000:2018 and NHS England Risk Management guidelines.

Risk Management Methodology

ASF’s risk management process for the Surveyor Training Programme adopts the standard 5×5 likelihood-impact matrix endorsed by ISO 31000:2018 (Risk management — Guidelines). Each identified risk is assigned:

  • Likelihood score (1–5): Rare → Unlikely → Possible → Likely → Almost Certain
  • Impact score (1–5): Negligible → Minor → Moderate → Major → Critical
  • Inherent risk score = Likelihood × Impact (range: 1–25)
  • Residual risk score after application of controls
  • Risk owner responsible for monitoring and control execution
  • Review date — mandatory annual review; ad hoc after incidents
Methodology Reference: ISO 31000:2018 §6.4 (Risk assessment); NHS England Risk Management Framework (2023 ed.), §3.2 “Risk scoring matrices”; HAS (Haute Autorité de Santé) guide Gestion des risques dans les organisations de santé (2017).

Programme Risk Register — Active Risks

Risk ID Risk Description Category Likelihood Impact Inherent Score Controls in Place Residual Score Owner Next Review
R-01 Insufficient recruitment of qualified surveyor candidates, leading to programme under-enrolment Strategic 2 — Unlikely 4 — Major 8 — Medium Targeted outreach partnerships with hospital professional associations; bursary scheme; annual review of eligibility criteria 4 — Low Programme Director Jan 2027
R-02 Trainer unavailability (illness, resignation) disrupting scheduled training cohorts Operational 3 — Possible 3 — Moderate 9 — Medium Minimum 2 qualified trainers per module; standby trainer list maintained; at least 4 weeks notice policy; module delivery can pivot to online format 3 — Low Training Coordinator Jan 2027
R-03 Assessment tools lacking psychometric validity, leading to incorrect pass/fail decisions and ISQua non-compliance (criterion 4.7–4.9) Quality / Compliance 2 — Unlikely 5 — Critical 10 — High Annual external psychometric review; Angoff standard-setting workshop before each new cohort; OSCEs reviewed by independent clinical panel; item bank maintained by qualified assessment specialist 4 — Low Assessment Lead Jun 2027
R-04 Data breach or unauthorised access to trainee personal data (GDPR violation) Legal / Compliance 2 — Unlikely 5 — Critical 10 — High Role-based access control (RBAC) on LMS; encrypted data at rest and in transit (TLS 1.3); quarterly GDPR compliance audit; Data Protection Officer appointed; breach notification procedure per GDPR Art. 33–34 (72-hour window) 4 — Low Data Protection Officer Jun 2027
R-05 ISQua accreditation review identifies major non-conformances, risking loss of EEA STP accreditation status Reputational / Strategic 2 — Unlikely 5 — Critical 10 — High Annual internal compliance audit against all 32 ISQua EEA STP criteria; gap-closure plan maintained and updated; ISQua Compliance Statement published and publicly accessible; self-assessment completed 6 months before external review 2 — Low Quality Director Jun 2027
R-06 Inadequate competency development of trainees due to insufficient mentorship hours or mentor quality Quality 2 — Unlikely 4 — Major 8 — Medium Minimum 10 supervised survey hours; structured mentor performance review (see Mentor & Trainer Performance Review Policy); mentor qualification criteria enforced; trainee satisfaction survey post-mentorship phase 3 — Low Training Coordinator Jan 2027
R-07 Financial sustainability risk: programme revenue insufficient to cover delivery costs Financial 2 — Unlikely 4 — Major 8 — Medium Annual programme budget review by Finance Committee; fee review linked to CPI; minimum cohort size threshold (n=6) before each cohort is confirmed; sponsorship agreements with partner organisations 4 — Low Finance Director Jan 2027
R-08 Digital platform failure (LMS outage) disrupting e-learning delivery and examination scheduling IT / Operational 2 — Unlikely 3 — Moderate 6 — Low SLA with LMS provider guaranteeing 99.5% uptime; backup examination platform (ProctorU) on standby; offline PDF module library maintained; IT incident response procedure (<4-hour recovery target) 2 — Low IT Manager Jan 2027
R-09 Conflict of interest in surveyor assessments compromising assessment integrity and accreditation credibility Ethical / Quality 2 — Unlikely 4 — Major 8 — Medium Mandatory conflict-of-interest declaration before each assignment; independent review panel for disputed decisions; ASF Code of Ethics; annual ethics training module for all surveyors 3 — Low Ethics Officer Jan 2027
R-10 Non-compliance with French labour law on training obligations (Plan de développement des compétences) Legal / Compliance 2 — Unlikely 4 — Major 8 — Medium Annual legal review by external counsel; compliance with Loi n°2018-771 du 5 septembre 2018 (Plan de développement des compétences); OPCO funding declarations submitted by 31 December each year 3 — Low HR Director Dec 2026

Risk Governance Structure

Oversight Responsibilities

  • Board of Directors: Approves risk appetite statement; reviews critical (score ≥15) and high (score 10–14) risks quarterly
  • Quality Director: Owns the Risk Register; coordinates annual review; escalates new high/critical risks to Board within 10 working days of identification
  • Programme Director: Primary risk owner for strategic and operational programme risks; reports to Quality Director monthly
  • Data Protection Officer: Sole owner of GDPR-related risks; independently reports to Board on data protection matters per GDPR Art. 38

Review Cycle

  • Annual full review: Every January; completed before spring cohort launch
  • Ad hoc review triggers: Any significant incident (near-miss, complaint, audit finding); organisational restructuring; new legislation; major change to programme structure
  • Interim monitoring: High and critical risks reviewed at quarterly Board meetings

References & Regulatory Basis

ISQua EEA STP 4th Edition (2021) — Criterion 1.3: “The organisation has a risk management process that identifies, assesses and manages risks associated with the surveyor training programme.” Available at: isqua.org

ISO 31000:2018 — Risk management — Guidelines. International Organisation for Standardisation, Geneva. §6.4 Risk assessment process.

NHS England Risk Management Framework (2023) — Provides the 5×5 risk scoring matrix adopted as sector standard in healthcare accreditation contexts.

GDPR — Regulation (EU) 2016/679 — Art. 32 (security of processing), Art. 33–34 (breach notification), Art. 38 (DPO function). Official Journal of the EU, 4 May 2016.

Loi n°2018-771 du 5 septembre 2018 (Loi “Avenir professionnel”) — Art. L.6315-1 et seq. Code du travail — obligation de formation et Plan de développement des compétences.

HAS (Haute Autorité de Santé, 2017) — Guide d’aide à la gestion des risques dans les organisations de santé. has-sante.fr