  • Leadership reviews the facility environmental impact once a year, as a documented review.
  • The review lists specific negative impacts from the facility own activities.
  • For each impact, record at least one realistic mitigation, even a partial one.
  • Record findings, decisions and an owner for each action.
  • Stop and get help straight away if: the review was never done, or it lists no impacts and no actions.

1. Purpose

To make sure leadership looks at the facility environmental impact as a whole each year and decides what to change, rather than leaving it to individual purchases or to one department [E-006, EC].

2. Scope

Applies to Chief executive, senior leadership team, facilities manager, procurement lead, waste lead
Locations The whole facility at the facility
When Once a year, and when a major change happens (new building, service change)
Does not apply to Routine energy and waste monitoring, covered by ENV-SOP-006

3. Definitions

Term Meaning
Environmental impact Effects of the facility activities on air, water, land, energy use, waste and climate
Mitigation An action that reduces a negative impact, even partly

4. Background

Environmental decisions made one purchase at a time do not add up to a strategy. Criterion 2C.1 asks for a strategic review by leadership, which looks at the whole picture. The ASF environmental principles are used as the starting point [E-006].

5. Responsibilities

Role Responsibility Competence
Chief executive Chairs the review; approves actions Executive leadership
Facilities manager Prepares the data and the impact list Facilities management
Waste lead and procurement lead Provide data on waste and purchasing Own area competence

6. Materials and equipment

Item Requirement Condition
Review template (ENV-FRM-006) Current Available to leadership
Data from energy, waste, procurement and carbon records Latest 12 months Available before the review

7. Safety

8. Before you start

9. Procedure

Step 1. Prepare the impact list.

  • List the main impacts of the facility: energy, water, waste, transport, purchasing and emissions.
  • Use the data, not general assumptions.

Key point: A review without data is an opinion.

Step 2. Hold the review.

  • Leadership meets once a year to review the list.
  • Record attendance, findings and decisions on ENV-FRM-006.

Key point: The record shows that leadership, not only staff, looked at the question.

Step 3. Identify realistic mitigations.

  • For each main impact, record at least one realistic mitigation, even if it only reduces the impact partly.
  • Estimate cost and effect where possible.

Key point: A realistic partial step beats a perfect plan that is never started.

Step 4. Set actions and owners.

  • Agree actions with an owner and a date for each.
  • Link actions to the programme in ENV-PLN-001 and the goals in ENV-PLN-002.

Key point: An action without an owner is not an action.

Step 5. Follow up.

  • Check progress at the next review, and record the outcome.

Key point: Follow-up shows the review changed something.

10. Decision points

11. Special situations

Situation Action
New building, refurbishment or new service Carry out an impact review before work starts, as part of the project approval.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Annual leadership review held and recorded Yes Yearly Chief executive Escalate to governing body
Actions with owner and date 100% Yearly Facilities manager Add owner within 14 days
Actions followed up at next review 100% Yearly Chief executive Review

14. Records

Record Kept in Retention
ENV-FRM-006 Leadership Environmental Review Record Governance file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
ENV-FRM-006 Leadership Environmental Review Record Used in steps 2 to 4
SOP-N09 Environmental Sustainability Policy (generic) Policy basis
ENV-PLN-001 Environmental Sustainability Programme Programme links to actions

17. Evidence

Reference Note
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus. Review frequency and scope set by the ASF Expert Committee.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version Approved by the ASF Expert Committee
1.1 the date of approval Internal quality review: corrected cross-references, status wording and document control Approved by the ASF Expert Committee

E-learning for this document

References

Download this document as PDF
© 2026 Accréditation Sans Frontières · PHIG · Sheni Network