Standards › Standard 2C › Plans and templates

Plan / template · FAC-PLN-002 · Version 1.1 · Approved by the ASF Expert Committee

Supports: 2C.7

At a glance

  • Set an early-warning trigger and an owner for each hazard.
  • Name the actions to keep services running: power, water, cooling, staffing, transfers.
  • Test the plan at least once a year and record the test (FAC-FRM-003).
  • Review the plan after each test, emergency, or change in risk.
  • Stop and get help straight away if: the plan has not been tested in the last 12 months.

1. Purpose

To keep essential services running and patients safe during a climate or health emergency [EC].

2. Scope

Applies to Chief executive, facilities, clinical, infection prevention, and IT leads
Locations The whole facility
When In force at all times; tested yearly; reviewed after events
Does not apply to Routine downtime, covered by FAC-PLN-001

3. Definitions

Term Meaning
Trigger The signal, such as a weather warning or a power cut, that starts an action
Essential service A service that must continue to keep patients safe

4. Background

The plan turns the assessment into actions. Criterion 2C.7 asks for a plan that is tested and reviewed, not written once and left.

5. Responsibilities

Role Responsibility Competence
Chief executive Activates the plan and makes decisions Executive
Facilities manager Leads the operational response Facilities
Clinical leads Protect patients and move them if needed Clinical
Communications lead Informs staff, patients and authorities Communication

6. Materials and equipment

Item Requirement Condition
Contact list (staff, suppliers, authorities) Current, checked quarterly Available to leadership
Stored water, fuel, cooling and emergency supplies Stock list (EC) Checked monthly
Continuity test record (FAC-FRM-003) Current On file

7. Safety

8. Before you start

9. Procedure

Step 1. Set triggers and owners.

  • For each hazard, set the early-warning trigger and the owner.

Key point: A trigger converts a warning into action.

Step 2. Act on triggers.

  • On trigger: alert the chief executive, activate the service response, protect vulnerable patients, and confirm power, water and cooling.
  • Record each action and its time.

Key point: Time-stamped actions are the record.

Step 3. Keep services running.

  • Use back-up power, stored water, and cooling for medicines and sensitive equipment, as set in FAC-PLN-001.
  • If services cannot continue, decide transfers with clinical leads.

Key point: Plan the transfer before it is needed.

Step 4. Test yearly.

  • Run a desktop or live test at least yearly.
  • Record the test, the gaps found and the actions on FAC-FRM-003.

Key point: An untested plan is not a plan.

Step 5. Review.

  • Review the plan after each test, each emergency, and any change in risk.
  • Update and retell staff.

Key point: Lessons learned must be written into the plan.

10. Decision points

11. Special situations

Situation Action
Heatwave Cool wards and storage for medicines, check patients at risk, and increase hydration support (EC).
Flood or storm Protect equipment, power and records; plan access for staff.
Outbreak Follow the infection prevention plan and national guidance.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Plan tested in last 12 months Yes Yearly Facilities manager Escalate to chief executive
Test gaps closed within set time 100% After each test Facilities manager Escalate
Contact list checked Quarterly Quarterly Communications lead Correct

14. Records

Record Kept in Retention
FAC-FRM-003 Continuity Test Record Facilities file the period set by the facility’s records policy years
Activation log Incident file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
FAC-SOP-003 Climate and Health Emergency Risk Assessment Basis
FAC-FRM-003 Continuity Test Record Used in step 4
EMG-SOP-001 Fire Safety and Evacuation Related emergency
SOP-N17 Emergency Preparedness and Response Plan (generic) Generic basis

17. Evidence

Reference Note
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus. Actions and thresholds are local decisions.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version Approved by the ASF Expert Committee
1.1 the date of approval Internal quality review: corrected cross-references, status wording and document control Approved by the ASF Expert Committee

E-learning for this document

Planned course: Climate and environmental resilience planning. New course planned.

References

Download this document as PDF
© 2026 Accréditation Sans Frontières · PHIG · Sheni Network