Plan · FLD-PLN-003 · Version 1.0 · Approved by the ASF Expert Committee

Supports: 9.11

At a glance

  • The plan names the permanent service that receives each patient and record.
  • Each patient is transferred with a written handover (HOS-FRM-004).
  • Records are transferred or stored under REC-POL-001.
  • Closure is recorded with the count of patients and records transferred.
  • Stop and get help straight away if: the unit closes with a patient or record unaccounted for.

1. Purpose

To move each patient and record to a permanent service when the unit closes or hands over (9.11).

2. Scope

Applies to Clinical and support staff in the hospital
Locations All wards, clinics and departments of the facility
When Whenever the activity described is carried out
Does not apply to Activities covered by another document listed in section 15

3. Definitions

Term Meaning
Clinical lead The doctor or nurse in charge of the area at the time

4. Background

A field unit is temporary, but its patients are not. When it closes, the patients and their records must go to a permanent service, or care stops.

5. Responsibilities

Role Responsibility Competence
Field unit lead Owns the closure and names the receiving services Clinician
Records lead Checks every record moves Records

6. Materials and equipment

Item Requirement Condition
Records and forms named in this document Current version Checked before use

7. Safety

8. Before you start

9. Procedure

Step 1. Name the receiving service.

  • Name the permanent service for each open patient before closure.

Key point: A service for each patient.

Step 2. Hand over.

  • Hand over each patient with HOS-FRM-004, and move each record.

Key point: A written handover each.

Step 3. Close and count.

  • Count patients and records transferred, and record the closure.

Key point: Nothing unaccounted for.

10. Decision points

11. Special situations

Situation Action
Out of hours Follow the same steps. Use the on-call contact on the wall of the area.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Patients and records accounted for at closure 100% Each closure Field unit lead Escalate to the coordinating authority

14. Records

Record Kept in Retention
Record named in this document Patient record or the area file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
HOS-FRM-004 Handover record (existing, reused) Record
REC-POL-001 Records management and retention (existing, reused) Policy

17. Evidence

Reference Note
E-009 Based on WHO classification and minimum standards for emergency medical teams (2013).
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version set Expert Committee approval

E-learning for this document

No e-learning course is linked to this document yet.

References