Standards › Standard 2C › Standard operating procedures (SOPs)

Standard operating procedure (SOP) · ENV-SOP-006 · Version 1.1 · Approved by the ASF Expert Committee

Supports: 2C.5

At a glance

  • Read each energy meter (electricity, gas, fuel) monthly and record by source.
  • Compare with the same month last year and with the target.
  • Act on the largest users first.
  • Explore a renewable option each year and record the feasibility.
  • Never reduce ventilation, cooling or heating that keeps patients safe.
  • Stop and get help straight away if: a meter is not read for a month, or a safety system is switched off to save energy.

1. Purpose

To monitor the facility energy use by source, and to take concrete, safe steps away from fossil fuel reliance where practical [E-006, EC].

2. Scope

Applies to Facilities team, energy lead, chief executive
Locations All meters and energy systems at the facility
When Monthly reading; quarterly review; yearly feasibility review
Does not apply to Carbon footprint method, covered by ENV-SOP-007

3. Definitions

Term Meaning
Energy source Electricity, natural gas, diesel, or any other fuel used
Renewable option Solar, or a supply contract with renewable electricity, where available

4. Background

A facility that does not measure energy cannot reduce it. Criterion 2C.5 asks for monitoring by source, and concrete steps toward less fossil fuel use where practical.

5. Responsibilities

Role Responsibility Competence
Facilities manager Owns the meters and the monthly record Facilities engineering
Energy lead (named by facilities manager) Runs the reduction plan and the feasibility review Energy management (EC)
Chief executive Approves the plan and any investment Executive

6. Materials and equipment

Item Requirement Condition
Meters for electricity, gas and fuel Working and labelled by area Read monthly
Monthly energy record (ENV-FRM-008) Current Completed monthly
Reduction plan (ENV-PLN-003) Current Reviewed yearly

7. Safety

8. Before you start

9. Procedure

Step 1. Read the meters.

  • Read each meter on the same day each month.
  • Record the reading by source and area on ENV-FRM-008.

Key point: A consistent reading day makes the trend reliable.

Step 2. Compare and analyse.

  • Compare each month with the same month last year and with the target.
  • Identify the top three users or areas.

Key point: Look for the largest users first.

Step 3. Act on the largest sources.

  • Agree at least one concrete step per quarter, such as lighting controls, timers, insulation repairs or equipment shut-down outside use, where safe.
  • Record the action and its effect on ENV-PLN-003.

Key point: Concrete steps are the evidence of a move.

Step 4. Assess renewable options yearly.

  • Each year, assess the feasibility of renewable options: on-site solar, a renewable electricity contract, or others.
  • Record the assessment, cost and decision.

Key point: Even a decision not to proceed, with the reason, meets the criterion.

Step 5. Report.

  • Include energy use and trend in the quarterly governance report (ENV-FRM-003).

Key point: Reporting keeps energy on the agenda.

10. Decision points

11. Special situations

Situation Action
Power failure or generator use Record the fuel used by the generator as a separate source.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Monthly readings recorded for each source (12 months) 100% Monthly Facilities manager Escalate to chief executive
Concrete reduction step each quarter 100% Quarterly Energy lead Escalate to governing body
Renewable option assessed each year Yes Yearly Chief executive Escalate

14. Records

Record Kept in Retention
ENV-FRM-008 Monthly Energy Use Record Facilities file the period set by the facility’s records policy years
ENV-PLN-003 Energy Reduction and Renewable Options Plan Governance file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
ENV-FRM-008 Monthly Energy Use Record Used in step 1
ENV-PLN-003 Energy Reduction and Renewable Options Plan Used in steps 3 and 4
ENV-FRM-003 Sustainability Progress Report Quarterly report

17. Evidence

Reference Note
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus. Energy targets and renewable options are EC and facility decisions.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version Approved by the ASF Expert Committee
1.1 the date of approval Internal quality review: corrected cross-references, status wording and document control Approved by the ASF Expert Committee