Standards › Standard S1 › Plans and templates

Plan / template · HOS-PLN-001 · Version 1.0 · Approved by the ASF Expert Committee

Supports: System S1 (Hospital), criterion S1.12

At a glance

  • Follow this plan when there are mass casualties, or when power, water or oxygen fails.
  • The duty manager declares the incident and calls the response team.
  • Each person knows their role on the card in their area.
  • Rehearse the plan at least once a year.
  • Stop and get help straight away if: oxygen or power fails and no one has been told what to do.

1. Purpose

To keep patients safe and care going when many patients arrive at once, or when a key utility fails (S1.12).

2. Scope

Applies to Clinical and support staff in the hospital
Locations All wards, clinics and departments of the facility
When Whenever the activity described is carried out
Does not apply to Activities covered by another document listed in section 15

3. Definitions

Term Meaning
Clinical lead The doctor or nurse in charge of the area at the time

4. Background

A hospital that loses power, water or oxygen, or receives a mass casualty, needs a plan that people have practised. A plan on the shelf does not work under pressure.

5. Responsibilities

Role Responsibility Competence
Duty manager Declares the incident; leads the response Senior manager
Clinical lead Sets clinical priorities Senior clinician
Estates lead Restores power, water and oxygen supply Estates

6. Materials and equipment

Item Requirement Condition
Role cards for each area Current Displayed in each area
Back-up power and oxygen supply Tested monthly Estates log

7. Safety

8. Before you start

9. Procedure

Step 1. Declare.

  • The duty manager declares the level of incident.
  • Call the response team.

Key point: Declare early.

Step 2. Prioritise.

  • Use the triage tool to sort patients.
  • Use the role card.

Key point: Care follows the triage, not the arrival.

Step 3. Keep utilities running.

  • Switch to back-up.
  • Check oxygen levels every hour and move patients to working supply.

Key point: Oxygen is the priority.

Step 4. Stand down and review.

  • Stand down when the risk ends.
  • Hold a debrief within 72 hours and record the actions.

Key point: The debrief is where the plan improves.

10. Decision points

11. Special situations

Situation Action
Out of hours Follow the same steps. Use the on-call contact on the wall of the area.

12. Escalation

13. Monitoring

Measure Target Frequency Owner If not met
Rehearsal done in the last 12 months 100% Yearly Duty manager Escalate to chief executive
Back-up power and oxygen tested 100% Monthly Estates lead Escalate to chief executive

14. Records

Record Kept in Retention
Record named in this document Patient record or the area file the period set by the facility’s records policy years

15. Training

16. Related documents

ID Title Use
HOS-REG-004 Rehearsal and drill record Records each drill
EMG-SOP-001 Fire safety and evacuation Evacuation in an utility failure

17. Evidence

Reference Note
E-009 Plan content to be checked against the WHO Hospital Safety Index (2017).
E-006 ASF Policy Framework v1.2. Adapted.
E-009 ASF Expert Committee consensus.

18. Change history

Version Date What changed Approval
1.0 the date of approval First version set Expert Committee approval

E-learning for this document

No e-learning course is linked to this document yet.

References

Download this document as PDF