EDITIONEN·FR·ქართ

Accréditation Sans Frontières

International Accreditation of Healthcare Facilities

Standards › ASF Health Standards v10 › Standard 46

Standard 46

Hospital Disaster and Emergency Preparedness

Hospital disaster and emergency preparedness: a written plan with a named incident lead, hazards assessed, essential services kept running when utilities fail, staff trained and drills held, and the plan changed after each activation.

5
criteria
6
documents
1
e-learning courses
2
references

Criteria on this page

46.146.246.346.446.5

46.1
A Hospital Disaster Plan Is Written and Owned

A written disaster plan covers the whole facility. A named incident lead is responsible for it and can act at any hour.

Humanitarian settings
Essential
Transition
Essential
Standard
Essential

Why it matters. A hospital hit by a disaster must know who leads the response and what to do. A written plan that covers the whole facility, with a named lead, is the basis of the response.

How the surveyor verifies this criterion

Sample. Review the disaster plan, the incident lead rota and the activation records for the last 12 months.

1. A written disaster plan covers the whole facility.

Method. Compare the plan with the list of buildings, services and departments.

Evidence to show. Mass-casualty and utility failure plan (HOS-PLN-001, existing, reused).

Pass when. Every building, service and department is covered by the plan.

2. A named incident lead and deputy are responsible for the plan.

Method. Check the approved plan and the on-call rota for the names and roles.

Evidence to show. Hospital disaster plan ownership and incident lead (DIS-POL-001).

Pass when. A named incident lead and deputy are recorded for every period in the sample.

3. The incident lead can be reached and can act at any hour.

Method. Make an unannounced test call to the incident lead at a time outside working hours.

Evidence to show. Hospital disaster plan ownership and incident lead (DIS-POL-001).

Pass when. The incident lead answers and can give the activation decision within the set time.

Immediate fail (any one means the criterion is not met)

  • A flood cuts power at night, and no one has authority to activate the plan because the incident lead cannot be reached.

Documents

Policies

DIS-POL-001 · Hospital disaster plan ownership and incident lead

E-learning

References

  1. World Health Organization (2021). Global Patient Safety Action Plan 2021–2030: Towards Eliminating Avoidable Harm in Health Care. Geneva: WHO. https://www.who.int/publications-detail-redirect/9789240032705
  2. World Health Organization. Classification and minimum standards for emergency medical teams. Geneva: WHO; 2013.
46.2
Hazards Are Assessed, Including Climate and Utilities

A hazard and vulnerability assessment is completed and kept up to date. It covers natural hazards, technical failures, violence, outbreaks and the effects of climate on the facility and its supplies.

Humanitarian settings
Recommended
Transition
Recommended
Standard
Recommended

Why it matters. Hospitals face different hazards: floods, earthquakes, heat, power loss. A regular hazard assessment, including climate and utilities, shows which ones matter most.

How the surveyor verifies this criterion

Sample. Review the hazard and vulnerability assessment and its last update, and the controls set for high-scoring hazards.

1. The assessment covers natural hazards, technical failures, violence, outbreaks and the effects of climate change.

Method. Compare the list of hazards with each category required by the standard.

Evidence to show. Hazard and vulnerability assessment (DIS-SOP-001); hazard assessment record (DIS-FRM-001).

Pass when. Every required category is covered by at least one scored hazard.

2. The assessment is completed and updated each year and after any event.

Method. Check the date of the last review and the events recorded since then.

Evidence to show. Hazard and vulnerability assessment record (DIS-FRM-001); climate and health emergency risk assessment (FAC-SOP-003, existing, reused).

Pass when. The assessment was updated within the last 12 months and after each recorded event.

3. High-scoring hazards have a control or plan.

Method. Check each high-scoring hazard for its control or plan.

Evidence to show. Climate and health emergency continuity plan (FAC-PLN-002, existing, reused).

Pass when. Every high-scoring hazard has a control or plan recorded.

Immediate fail (any one means the criterion is not met)

  • A known flood risk is scored low, and the facility has no plan for the basement pumps when the river rises.

Documents

Standard operating procedures (SOPs)

DIS-SOP-001 · Hazard and vulnerability assessment
Forms

DIS-FRM-001 · Hazard and vulnerability assessment record

E-learning

References

  1. World Health Organization. Operational framework for building climate resilient and low carbon health systems. Geneva: WHO; 2015.
  2. World Health Organization. Classification and minimum standards for emergency medical teams. Geneva: WHO; 2013.
46.3
Essential Services Continue When Utilities Fail

Power, water, oxygen and medical gas supplies have a backup that is tested on a defined schedule. The backup covers the services needed to keep patients alive.

Humanitarian settings
Essential
Transition
Essential
Standard
Essential

Why it matters. When the power or water fails, the hospital must keep the essential services running. Backup supplies, tested on a schedule, make that possible.

How the surveyor verifies this criterion

Sample. Review the back-up test records for power, water, oxygen and medical gas, for the last 12 months.

1. Each back-up for power, water, oxygen and medical gas is tested on a defined schedule.

Method. Compare the test register with the schedule set in the plan.

Evidence to show. Utility back-up test register (DIS-REG-001); back-up for power, communication and equipment (EDP-POL-002, existing, reused).

Pass when. Every back-up was tested within its scheduled interval.

2. The back-up covers the services needed to keep patients alive.

Method. Check which services each back-up supports against the list of life-sustaining services.

Evidence to show. Continuity test record (FAC-FRM-003, existing, reused).

Pass when. Every life-sustaining service is covered by a tested back-up.

3. Tests are recorded, and failures are corrected before the next test.

Method. Check each failed test for the action taken and the date of the next passed test.

Evidence to show. Utility back-up test register (DIS-REG-001).

Pass when. Every failed test has an action recorded and a later test that passed.

Immediate fail (any one means the criterion is not met)

  • The oxygen back-up was never tested, and the first power cut leaves ventilated patients without oxygen supply.

Documents

Registers and logs

DIS-REG-001 · Utility back-up test register

E-learning

References

  1. World Health Organization. Classification and minimum standards for emergency medical teams. Geneva: WHO; 2013.
46.4
Staff Are Trained and Drills Are Held

Staff know their role in the plan. A drill is held at a defined interval, and the result is recorded and used to improve the plan.

Humanitarian settings
Recommended
Transition
Recommended
Standard
Recommended

Why it matters. A disaster plan that staff have never practised will fail when used. Staff must know their role, and drills must be held and reviewed.

How the surveyor verifies this criterion

Sample. Review drill records and staff role records for the last 12 months.

1. Staff know their role in the plan.

Method. Ask a sample of staff from each area what they would do on activation.

Evidence to show. Drill evaluation record (DIS-FRM-002).

Pass when. Staff in every sampled area can state their role.

2. A drill is held at the defined interval.

Method. Compare the drill record with the interval set in the plan.

Evidence to show. Rehearsal and drill record (HOS-REG-004, existing, reused); emergency drill register (URG-REG-001, existing, reused).

Pass when. A drill was held within each defined interval.

3. The drill result is recorded and used to improve the plan.

Method. Check the drill evaluation for findings and the plan changes that followed.

Evidence to show. Drill evaluation record (DIS-FRM-002).

Pass when. Every drill has a recorded result and each finding has a plan change or a reason.

Immediate fail (any one means the criterion is not met)

  • No drill has been held in two years, and on activation staff do not know who leads the response.

Documents

Forms

DIS-FRM-002 · Drill evaluation record

E-learning

References

  1. World Health Organization (2021). Global Patient Safety Action Plan 2021–2030: Towards Eliminating Avoidable Harm in Health Care. Geneva: WHO. https://www.who.int/publications-detail-redirect/9789240032705
46.5
The Plan Is Reviewed After Each Activation

After each real activation of the plan, or after a drill with significant findings, a structured review is held. The review results in written changes to the plan.

Humanitarian settings
Recommended
Transition
Recommended
Standard
Recommended

Why it matters. After a real disaster, or a drill that exposes gaps, the plan must be changed. Reviewing it after each activation keeps it realistic.

How the surveyor verifies this criterion

Sample. Review every activation and every drill with significant findings in the last 12 months, and their review records.

1. A structured review is held after each real activation or significant drill.

Method. Check the review record for each activation and each drill with significant findings.

Evidence to show. Review after plan activation (DIS-SOP-003); post-incident debrief record (PTR-FRM-007, existing, reused).

Pass when. Every sampled activation has a review record.

2. The review is held within 14 days.

Method. Compare the review date with the date of the activation or drill.

Evidence to show. Review after plan activation (DIS-SOP-003).

Pass when. Every sampled review was held within 14 days.

3. The review results in written changes to the plan.

Method. Check each finding for a written change to the approved plan.

Evidence to show. Root cause analysis of serious incidents (INC-SOP-001, existing, reused); review after plan activation (DIS-SOP-003).

Pass when. Every finding has a written change to the plan, with an owner and a date.

Immediate fail (any one means the criterion is not met)

  • After a real activation, the review is never held, and the same evacuation fault happens at the next drill.

Documents

Standard operating procedures (SOPs)

DIS-SOP-003 · Review after plan activation

E-learning

References

  1. World Health Organization (2021). Global Patient Safety Action Plan 2021–2030: Towards Eliminating Avoidable Harm in Health Care. Geneva: WHO. https://www.who.int/publications-detail-redirect/9789240032705

Additional resources: guidelines in the GMJ library

These guidelines are held in the GMJ guideline library (news.gmj.ge). WHO and PAHO are the issuing bodies; MSF guidelines are marked MSF.

Back to ASF Health Standards v10 · Standards Map · E-learning by standard · References

© 2026 Accréditation Sans Frontières · PHIG · Sheni Network